top of page

HVAC Load Calculations

Central Energy Audits provides residential Manual J load calculations, Manual S equipment selection and Manual D duct design. For a new home, addition or HVAC replacement, these related services help turn building details into a documented basis for system sizing and design.

​

Request a project quote with your location, floor plans, insulation and window specifications, and any permit requirements. Confirm the deliverables and schedule before ordering; a load calculation alone does not include equipment selection or duct design.

​

Blueprint

Manual J, S, and D Calculations

Manual J calculations estimate residential heating and cooling loads using the home’s dimensions, orientation, windows, insulation and design conditions. The result provides the starting point for equipment selection. Square footage or the existing unit’s size alone is not a substitute for evaluating the building.

Manual S equipment selection uses the calculated loads and manufacturer performance data to evaluate heating and cooling equipment for the project. This step connects the building’s needs to a specific equipment choice. Confirm the proposed equipment and design assumptions before installation.

Manual D duct design addresses how the system delivers air to individual rooms. It considers airflow requirements, the duct route and resistance through the distribution system. Coordinate the design with the selected equipment and available building space; a duct leakage test answers a different question.

ACCA Manual D Residential Duct Systems handbook
ACCA Manual S Residential Equipment Selection handbook
ACCA Manual J Residential Load Calculation handbook
bottom of page